June 7, 2010 - June 11, 2010
On Monday Empfield Construction finished filling and compacting the 6”-9” with a different type of soil (which will include more “long grain sand” in the soil) to bring the level of the ground to the proper level.  It rained almost every evening this past week, which left the ground too wet to dig the trenches for the footings.  However, workers from Simon Contractors were still busy completing the installation of the “batter boards” (which are set up outside the corners of the new church to help with the accurate layout of the footings).  Simon Contractors also continued assembling the re-bars which will be put into the pad footings and footings.  In addition they assembled the anchor bolts and column base plates for the steel columns.  Having these pieces assembled will speed up the process of getting the footings ready for concrete, once the ground is dry enough to dig the trenches.
SEAS BuildingSite 061110 0528 COMPRESSED web
SEAS BuildingSite 061110 0529 COMPRESSED web
SEAS BuildingSite 061110 0530 COMPRESSED web
SEAS BuildingSite 061110 0531 COMPRESSED web
SEAS BuildingSite 061110 0533 COMPRESSED web
Simon ArchorBolts 061110 0534 COMPRESSED web
Simon AnchorBolts 061110 0536 COMPRESSED web
SEAS BuildingSite 061110 0537 COMPRESSED web
SEAS BuildingSite 061110 0539 COMPRESSED web
SEAS BuildingSite ConstructionTrailers 061110 0541 COMPRESSED web
Simon Assembled ReBarsUnitsforFootings 061110 0543 COMPRESSED web
Simon AssembledReBarsUnitsforFootings 061110 0545 COMPRESSED web
Simon AnchorBolts 061110 0548 COMPRESSED web
SEAS BuildingSite 061110 0549 COMPRESSED web
SEAS BuildingSite 061110 0550 COMPRESSED web
SEAS BuildingSite 061110 0551 COMPRESSED web
SEAS BuildingSite 061110 0554 COMPRESSED web


Return to St. Elizabeth Ann Seton Home Page / Building Our New Church Main Page / Previous Week / Next Week