October 25, 2010 - October 29, 2010
On Monday, not much work was done due to the wet weather.  On Tuesday, and Wednesday, due to the wind, work was slower.  Each day, workers from Covert Custom Carpentry from Kearney worked on the roof of the church.  They assembled and installed “cant strips” so that the TGI’s would rest on the cant strips.  They continued to assemble and install the TGI rafters at a distance of 1 ft apart.  In installing the TGI rafters they used the ½” particle board “V” shaped pieces and also rectangular pieces of ½” particle board on each side of the 12” pre-engineered rafters at the location where the rafters attached to the “cant strips”.  They finished installing the TGI rafters over the Narthex, Nave & Sanctuary area.  They also installed the eave boards at bottom ends of TGI rafters.

On a couple of days, workers from Mitchell Drywall continued to install a few more metal studs for the exterior walls.  They also installed flat metal strips horizontally about every 4’.  They will be behind the seams of the plywood on the exterior of the outside walls, and also behind the seams of the drywall on the interior walls.
BuildingSite 102810 3008
CovertEastRoofTGI 102810 3009
SnellPlumbing DrainPipeOutFlow 102810 3010
CovertEastRoofTGIandStraps 102810 3012 CovertEastRoofTGIandStrapsEastTranseptTruss 102810 3015 SnellPlumbing DrainPipeOutFlow 102810 3011
CovertEastRoofTGIandStrapsEastTranseptTruss 102810 3016
SEAS WestNaveInteriorView 102810 3017
SEAS RoofTrussChoirLoftView 102810 3018
SEAS EastNaveWall 102810 3021 SEAS BuildingSiteINTERIORNave 102810 3020
SEAS WestNaveWall 102810 3022
CovertWestRoofTGIandStraps 102810 3024 CovertWestRoofTGIandStraps 102810 3023 SimonWeldingSteelatFrontDoor 102810 3019
CovertEastRoofEaveBoards 102810 3025
CovertEastRoofEaveBoards 102810 3026
CovertEastRoofEaveBoards 102810 3028
CovertEastRoofEaveBoards 102810 3029
MitchellWestNaveFlatMetalStrips 102810 3031 MitchellEastNaveFlatMetalStrips 102810 3030
SEAS BuildingSiteINTERIOR 102810 3033
SEAS BuildingSiteINTERIORNave 102810 3034





Return to St. Elizabeth Ann Seton Home Page / Building Our New Church Main Page / Previous Week / Next Week